Precautions when starting ventilation equipment
Classification :Industry NewsDATE:2017-09-06

(1) ventilation equipment should be started before the fan inlet adjustment damper close to prevent misuse, with load start.

(2) check the bearing oil level is normal, cooling water supply, the coupling is intact, maintenance hole is closed.

(3) Check the ventilation equipment should be running without exception.

(4) ammeter instructions to return to no-load current, you can adjust the throttle opening in the appropriate location.

(5) Note that the start-up time and no-load current is normal.

        Kunshan City, the new You have Machinery Co., Ltd. professional ventilation pipe for many years, is a spiral duct. Rectangular duct. Glass magnesium composite duct. Phenolic composite duct professional manufacturers and undertake the country to undertake large-scale ventilation installation works. Duct is mainly used for construction, ship air conditioning and ventilation works. The spiral duct consists of single and double spiral ducts and various accessories to form a complete ventilation duct system. Each of the joints are flame-retardant rubber and non-adiabatic spiral duct and accessories. The company's glass magnesium composite duct, phenolic composite duct, high-performance, high-quality, far ahead in the same industry, by the customer's Praise. Duct products are designed, self-produced, self-installed and sales, products all over the country; business in various fields have been good development, and long-term environmental protection for a number of projects, fan manufacturers, ventilation, air conditioning, dust system customers Perfect design, installation, commissioning and after-sales maintenance, and other ancillary works services, won the majority of customers trust and support.