In the production of spiral duct, we want the most material correction,
correction of the way of cold and hot two forms, we should pay attention
to the manufacturing of spiral duct when the steel must be heated to
900 degrees above the thermal correction is guaranteed on the quality of
product, and then in order to ensure the bearing capacity of spiral
duct we are going to have, punching and cutting of steel, guarantee the
hoop and the wind pipe arc arc, weld full support.
Second, when
installing spiral tube, according to the standard height of spiral duct
on spiral duct of some small sense of length, if it is to set the thread
should not be too long and the end of the thread tray should not exceed
the minimum.
Finally, the spiral air pipe installation, whether
it is the wind pipe itself or the stent, should do a good job as if the
insulation protection