Attentive Problems in Duct Machining Process
Attentive Problems in Duct Machining Process
The ducts shall not be of the S-type cuttings, the C-type right-angled cuttings and the connecting corners. Air clean level of 1 to 5 of the duct can not be used buttoned mouth.
Purification air conditioning system duct flange flange spacing should be less than 100 mm, air cleanliness of 1 to 5 duct flange rivets spacing should be less than 65mm.
No reinforcement or reinforcement bars shall be provided in the duct.
Duct processing should be used before the cleaning fluid to remove the surface of the plate oil and dust, cleaning fluid should be used on the surface of the sheet without damage, dry does not produce dust, and the human body without harm to the neutral detergent.
Ventilation pipe production should be used to clean the cleaning solution, after cleaning by the white silk cloth to meet the requirements of cleaning, phenolic board, should be promptly sealed.
The inner wall of the colored coated steel duct shall be smooth; the sheet shall not be damaged during processing. The damaged part shall be coated with epoxy resin.
Duct seam, riveting joints and flange flanging four corners of the gap, should be designed and clean grade requirements, the use of coating sealant or other sealing measures blocked. Sealing materials should be used isobutyl rubber, chloroprene rubber, denatured silica gel as the substrate material. The sealing surface of the duct joint shall be provided on the positive pressure side of the duct wall.
Air duct production site should be relatively closed, the production site should lay the soft material is not easy to produce dust
The duct should be reduced in longitudinal joints, FRP ventilation pipes, and shall not have transverse joints.
Duct processing connection bolts, nuts, washers and rivets should be galvanized or other anti-corrosion measures, shall not use core pulling rivets.