Kunshan new Youde Machinery: Ventilation pipeline maintenance measures
Kunshan Xinyou machinery, focus on ventilation pipes, central air-conditioning pipeline equipment sales, design, installation
Ventilation ducts are widely used in construction projects. In the use of the installation after the completion of the ventilation duct how to do the daily protection? From the following aspects:
1, after the installation of ventilation ducts to ensure smooth surface clean, exposed in the outdoor air duct to be rain, snow measures.
2, the ventilation duct into the structure of the wind tunnel at the end to install the steel mesh, so to prevent debris into the ventilation system when running, the ventilation duct and structural duct cracks should be sealed tightly.
3, the pipeline through the settlement joints should be installed according to the design requirements of casing, casing and air duct gap with packing (soft) sealing tight.
4, ventilation pipe transport and installation of stainless steel, aluminum ducts should avoid scratching the surface of the phenomenon, to minimize the installation and contact with iron objects. In addition, surface and blade deformation due to impact should be avoided. Open-air piling up should be rain, snow measures.